What a Commercial Lobby Fit-Out Actually Costs in Dubai

Published 2026-07-27 · Emirates Oasis Interior Designs

What drives the number

Lobby fit-out cost is driven by three things: the finishes specified, the amount of joinery and stonework, and how much MEP and ceiling work is disturbed. Two lobbies of identical size can differ several-fold on finishes alone.

Where budgets get lost

Usually in variation orders - changes agreed on site without a revised scope. A fixed scope agreed at design stage, with allowances stated for the items still open, prevents most of it.

What a good proposal contains

A drawn concept, a finishes schedule with named products, a programme tied to building access hours, and a stated allowance for anything not yet chosen.

Common questions

How long does a lobby fit-out take?

Most commercial lobbies run several weeks on site once drawings are approved and materials are in country.

Can you work outside building hours?

Yes - occupied buildings are usually worked evenings and weekends to avoid disrupting tenants.